找回密码
 注册
搜索
查看: 509|回复: 0

[资料] EMC Testing -- Part 2

[复制链接]
发表于 2006-12-4 16:05:50 | 显示全部楼层 |阅读模式
Table of contents for this Part

2    Conducted emissions
2.1 Transducers for conducted emissions tests
2.1.1     Close-field probes
2.1.2     ‘Bug detectors’
2.1.3     Current probes
2.1.4     Absorbing clamps
2.1.5     Voltage probe
2.1.6     Errors in non-invasive measurements due to impedance variations
2.1.7     LISNs and AMNs
2.1.8     Measuring CM and DM with LISNs
2.1.9     Transient limiters
2.1.10   ISNs
2.2 Development, diagnostic, and QA testing
2.2.1     Using oscilloscopes
2.2.2     Using low-cost spectrum analysers
2.2.3     Using radio receivers
2.3 ‘Pre-compliance’ testing
2.4 On-site testing of systems and installations
2.5 Full compliance testing
2.5.1     Mains conducted tests
2.5.2     Telecom cables
2.5.3     ‘Disturbance power’ tests
2.6 Discontinuous disturbances
2.7 Instrumentation requirements for conducted and radiated emissions tests


【文件名】:06124@52RD_EMC Testing - Part 2.pdf
【格 式】:pdf
【大 小】:1092K
【简 介】:
【目 录】:


本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有账号?注册

×
高级模式
B Color Image Link Quote Code Smilies

本版积分规则

Archiver|手机版|小黑屋|52RD我爱研发网 ( 沪ICP备2022007804号-2 )

GMT+8, 2024-10-6 10:37 , Processed in 0.046237 second(s), 17 queries , Gzip On.

Powered by Discuz! X3.5

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表