|
XX移动通信公司音频测试操作手册,图文并茂
【文件名】:06111@52RD_Audio Test System Manual.doc
【格 式】:doc
【大 小】:127K
【简 介】:
【目 录】:
After setup completed, there will be two shortcuts on the desktop. One is for Error Code, and the other is for the application.
Run the application. User must type in the Test Line Bench (format: p_n_s) and choose the Line Group A or B. Hear, p is the number for plant, n is the number for production line, and s is the number for the station. Generally, we define the first right side station is p_n_1, the second right side station is p_n_2, and the left side station is p_n_3. We define day production line is Group A, and night line is Group B. |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?注册
×
|