找回密码
 注册
搜索
查看: 774|回复: 2

[硬件测试资料] CTIA STANDARD-Test Plan for Mobile Station Over the Air Performance2008

[复制链接]
发表于 2008-4-27 10:49:09 | 显示全部楼层 |阅读模式
【文件名】:08427@52RD_CTIA STANDARD-Test Plan for Mobile Station Over the Air Performance2008 .rar
【格 式】:rar
【大 小】:3676K
【简 介】:
【目 录】:Section 1  Introduction...................................................................................................................1
1.1  Purpose............................................................................................................................1
1.2  Scope...............................................................................................................................1
1.3  Applicable Documents....................................................................................................1
1.4  Test Overview..................................................................................................................2
1.5  Equipment Under Test (EUT) – The Mobile Station......................................................3
1.6  Mobile Station Documentation........................................................................................3
Section 2  Scope of Measurements.................................................................................................4
2.1  Equipment Under Test (EUT) Measurements--Transmitter............................................4
2.2  Equipment Under Test (EUT) Measurements--Receiver................................................5
2.3  Equipment Under Test (EUT) Measurements--General..................................................5
2.4  Conical Cut Test Method.................................................................................................6
2.5  Great Circle Test Method................................................................................................6
Section 3  Test Site Characteristics & Quiet Zone Accuracy....................................................10
3.1  Minimum Measurement Distance..................................................................................10
3.2  Equipment required.......................................................................................................11
3.3  Test Frequencies............................................................................................................12
3.4  Terminology and Coordinate Systems...........................................................................12
3.5  Basic Measurement Procedure......................................................................................14
3.5.1  Probe Antenna Symmetry Test.......................................................................................14
3.5.2  Phi-Axis Ripple Test......................................................................................................15
3.5.3  Theta-Axis Ripple Test...................................................................................................17
3.5.4  Allowances and Adjustments.........................................................................................18
3.6  Applying the Ripple Test Procedure to Specific Systems.............................................20
3.7  Analysis.........................................................................................................................22
Section 4  Range Reference Measurement..................................................................................24
4.1  Theoretical Background................................................................................................24
4.2  Equipment required.......................................................................................................26
4.3  Test Frequencies............................................................................................................27
4.4  Test Procedure...............................................................................................................27
4.4.1  Measurement Step 1:  Source Reference Test (Cable Calibration)...............................28
4.4.2  Measurement Step 2:  Range Reference Test................................................................29
4.4.3  Calculating the Range Reference Path Loss.................................................................30
4.5  Range Reference Measurement Data File.....................................................................30
4.6  Alternate Scenarios........................................................................................................31
4.6.1  TRP Reference...............................................................................................................32
4.6.2  TIS Reference.................................................................................................................32
Section 5  Test Procedure – Radiated Power..............................................................................33
5.1  AMPS............................................................................................................................33
5.1.1  Test Procedure...............................................................................................................33
5.1.2  Criteria..........................................................................................................................34
5.2  CDMA...........................................................................................................................34
5.2.1  Test Procedure...............................................................................................................34
5.2.2  Criteria..........................................................................................................................36
5.3  TDMA...........................................................................................................................36
5.3.1  Test Procedure...............................................................................................................36
5.3.2  Criteria..........................................................................................................................38
5.4  GSM..............................................................................................................................38
5.4.1  Test Procedure.............5.4.2  Criteria..........................................................................................................................39
5.5  GPRS.............................................................................................................................40
5.5.1  Test Procedure...............................................................................................................40
5.5.2  Criteria..........................................................................................................................42
5.6  EGPRS...........................................................................................................................42
5.6.1  Test Procedure...............................................................................................................42
5.6.2  Criteria..........................................................................................................................44
5.7  UMTS (W-CDMA).......................................................................................................44
5.7.1  Test Procedure...............................................................................................................44
5.7.2  Criteria..........................................................................................................................46
5.8  CDMA 1xEV-DO DATA..............................................................................................46
5.8.1  Test Procedure...............................................................................................................46
5.8.2  Criteria..........................................................................................................................47
5.9  CDMA 1xRTT DATA...................................................................................................48
5.9.1  Test Procedure...............................................................................................................48
5.9.2  Criteria..........................................................................................................................50
5.10  Alternate Test Procedure for TRP.................................................................................50
5.10.1  Single point offset test....................................................................................................50
5.10.2  Multi-point offset test.....................................................................................................51
Section 6  Test Procedure – Receiver Performance...................................................................52
6.1  AMPS............................................................................................................................53
6.1.1  Test Procedure...............................................................................................................53
6.1.2  Criteria..........................................................................................................................53
6.2  CDMA...........................................................................................................................53
6.2.1  Test Procedure...............................................................................................................53
6.2.2  Criteria..........................................................................................................................55
6.3  TDMA...........................................................................................................................56
6.3.1  Test Procedure...............................................................................................................56
6.3.2  Criteria..........................................................................................................................57
6.4  GSM..............................................................................................................................58
6.4.1  Test Procedure...............................................................................................................58
6.4.2  Criteria..........................................................................................................................60
6.5  GPRS.............................................................................................................................60
6.5.1  Test Procedure...............................................................................................................60
6.5.2  Criteria..........................................................................................................................62
6.6  EGPRS...........................................................................................................................63
6.6.1  Test Procedure...............................................................................................................63
6.6.2  Criteria..........................................................................................................................65
6.7  UMTS (W-CDMA).......................................................................................................65
6.7.1  Test Procedure...............................................................................................................65
6.7.2  Criteria..........................................................................................................................67
6.8  CDMA 1xEV-DO DATA..............................................................................................67
6.8.1  Test Procedure...............................................................................................................67
6.8.2  Criteria..........................................................................................................................69
6.9  CDMA 1xRTT DATA...................................................................................................69
6.9.1  Test Procedure...............................................................................................................69
6.9.2  Criteria..........................................................................................................................71
6.10  Alternate Test Procedure for TIS...................................................................................71
6.10.1  Single point offset test....................................................................................................72
6.10.2  Multi-point offset test.....................................................................................................72
...............................................
............................................
Appendix E  Total Isotropic Sensitivity and Total Radiated Power Derivations (Informative)
136

E.1  Total Isotropic Sensitivity...........................................................................................136
E.2  Total Radiated Power..................................................................................................141
E.3  Conversion of Integrals to Summations of Discretely Sampled Pattern Data.............143
Appendix F  Symmetry Pattern Antenna (Informative)..............................................................147
Appendix G  Instructions for Calculating Standard Uncertainty Values (Normative).............148
G.1  Mismatch.....................................................................................................................148
G.2  Cable Factor.................................................................................................................148
G.3  Insertion Loss..............................................................................................................149
G.4  Receiving Device (Spectrum Analyzer, Measurement Receiver or Base Station
Simulator)....................................................................................................................149

G.5  Signal Generator or Base Station Simulator................................................................149
G.6  Gain of the Calibrated Reference Antenna..................................................................150
G.7  Measurement Distance................................................................................................150
G.7.1  Offset of the Phase Center of the EUT from Axis(es) of Rotation...............................150
G.7.2  Offset of the Phase Center of the Calibrated Reference Antenna from Axis(es) of
Rotation.......................................................................................................................151

G.7.3  Blocking Effect of the EUT on the Measurement Antenna (if too close).....................151
G.7.4  Phase Curvature Across the EUT................................................................................152
G.8  Signal Level Ripple Within Quiet Zone......................................................................153
G.8.1  Effect of Ripple on TRP and TIS Integration...............................................................153
G.8.2  Effect of Ripple on Range Reference Measurement....................................................156
G.9  Influence Quantities.....................................................................................................157
G.10  Positioning Uncertainty of EUT Against the Phantom................................................158
G.11  Sensitivity Search Step Size........................................................................................158
G.12  Coarse Sampling Grid in TIS Measurements..............................................................158
G.13  Miscellaneous Uncertainty..........................................................................................159
G.14  TIS Normalization Uncertainty...................................................................................159
Appendix H  Change History..........................................................................................................161


发表于 2008-5-3 06:25:57 | 显示全部楼层
So Detail information , Usefule for test engineer ,
Great thanks
点评回复

使用道具 举报

发表于 2009-11-11 17:52:51 | 显示全部楼层
dffffffffffffffffff
点评回复

使用道具 举报

高级模式
B Color Image Link Quote Code Smilies

本版积分规则

Archiver|手机版|小黑屋|52RD我爱研发网 ( 沪ICP备2022007804号-2 )

GMT+8, 2024-9-22 02:04 , Processed in 0.048263 second(s), 18 queries , Gzip On.

Powered by Discuz! X3.5

© 2001-2023 Discuz! Team.

快速回复 返回顶部 返回列表